MxmParts

Aluminum Tube Fabricate

Aluminum Tube Fabricate welded

Aluminum Tube Fabricate MIG welded

Aluminum Tube Fabricate Welded Components

Ming Xiao Manufacturing Co., Ltd engaged in tube bending services more than 10 years, we have produced various types of aluminum tube fabricate fittings from different materials, include welded tube and seamless pipe, Elliptical tube and rectangular tube, materials of stainless steel tube, aluminum tube, carbon steel tube, brass & copper tube.

We have a variety of tube fabricating equipment, such as automatic tube bending machine, semi-automatic tube bending machine, double-head tube bending machine, curved arc machine, diameter shrink machine,diameter enlarge machine, precision pipe cutting machine, welding machine, drilling Machine, etc.

We can produce tube bending fittings in various shapes, such as straight tube, C-shaped tube, L-shaped tube, U-shaped tube, S-shaped tube, and complex three-dimensional tube components. And do finish of polishing,anodizing, painting, powder coating, electrophoresis and other surface treatment methods.

Finding aluminum tube fabricate fittings?

If you are have any aluminum tube fabricate components need to be custom produced in China, pls feel free contact us to get a offer.

Shearing; crimping; laser cutting; bending; stamping; pressing; deep drawing; rolling; forming; fabricating; drilling; tapping; riveting; sopt welding; TIG; assembling

Materials for tube bending:

Seamless pipes & Welded pipes:
Carbon steel soft anneled
Stainless steel 201,304,316
Aluminum alloy of AL6061,AL5052,etc
Brass & Copper

Finish for tube bending:

Carbon Steel: Oiled, Heat treating, Carburization, Blackening (black oxide), Zinc plating, Chrome plating, Nickel plating, Powder coating, Painting, etc

Stainless Steel: Satin finish of Polishing & Milling, Brushed, Passivation, Chemical mirror polishing

Aluminum:Polishing, Brushed, Anodizing, Anodine, Powder coating, Painting, Electrophoresis, Vacuum coating, etc.

Lead time for custom new tube bending product is 30days.

Lead time for mass production:generally a order is 30-60days, if machining process is too complicated or quantity is very high,the lead time will longer.

We can provide COC (material certificate), Test Report, ROHS / SGS, plating report or coating reports also available !

Exit mobile version