MxmParts

Forging Welding Nuts

Forging Welding Nuts

Forging Welding Nuts China

Welding Nuts Lowest Prices For Selling

Ming Xiao Mfg is engaged in cold heading non-standard forging parts processing services,we have a friend factory produce cold forging standard fasteners,the main production is welding nuts and welding screws, Specs from M4 – M18,also can custom all kinds of hex nut,square nuts in UNC and Metric threads.

Welding nut is a nut is suitable for welding nut, generally can be welded and thicker and welding materials, welding is equivalent to two separate parts into a whole, with a high temperature metal melt together and then cooling, in the middle will join alloy, internal is a function of molecular force, intensity is generally larger than the maternal strength.

The test of welding parameters depends on the fusion size of the weld, and the welding parameters should be adjusted according to the fusion size until the defects are eliminated.

Of course, the quality of welding is related to welding pre-treatment, dust removal, oil stains and so on.

Attempts to sell welding nuts to foreign markets at the request of friendly factory, Ming Xiao can provide lowest ex-factory prices to foreign customers.Welcome send us inquiry, we will reply you in 48 hours.

The technics & capabilities for Turned parts : manual lathe turning,automatic lathe turning, numerical control lathe turning, Drilling, Grinding, Thread rolling, knurs rolling, cutting, cold heading, cold forging,hot die forging, welding, Riveting, milling, components Assembly, etc.

The precision telorance can reach to +/- 0.02mm, and the surface roughness can reach N6 standard after milling.

Available Materials for machined parts: Aluminum,copper/ brass,stainless steel,stainless iron,carbon steel, Mild steel,cold roll steel, Plastic Bar,etc.

Finish treating: Anodizing,hard anodizing,electroplating of chrome/zinc/nickel plated, tinning,copperize,Colour spray-painting, blackening, hot-dip galvanizing, tephlon plating, etc.

Lead time for custom samples of metal machined parts is 10days.

Lead time for mass production:generally a order is 30-60days, if machining process is too complicated or quantity is very high,the lead time will longer.

We can provide COC (material certificate), Test Report, ROHS / SGS, plating report or coating reports also available !

Exit mobile version