Custom Tube Components Bending & Fabricating
Ming Xiao Manufacturing Co., Ltd engaged in tube bending services more than 10 years, we have produced various types of tube bending fittings from different materials, include welded tube and seamless pipe, Elliptical tube and rectangular tube, materials of stainless steel tube, aluminum tube, carbon steel tube, brass & copper tube.
We have a variety of tube processing equipment, such as automatic tube bending machine, semi-automatic tube bending machine, double-head tube bending machine, curved arc machine, diameter shrink machine,diameter enlarge machine, precision pipe cutting machine, welding machine, drilling Machine, etc.
We can produce tube bending fittings in various shapes, such as straight tube, C-shaped tube, L-shaped tube, U-shaped tube, S-shaped tube, and complex three-dimensional tube components. And do finish of polishing,anodizing, painting, powder coating, electrophoresis and other surface treatment methods.
We are also produce CNC turned Parts,Metal Stamping Parts,plastic molded parts, can satisfied the mounting request for the tube components.
Welcome contact us to discuss your tube components which produced by bending & fabricating.
The technics & capabilities for machined parts : manual lathe turning,automatic lathe turning, numerical control lathe turning, Drilling, Grinding, Thread rolling, knurs rolling, cutting, cold heading, hot die forging, welding, Riveting, milling, components Assembly, etc.
The precision telorance can reach to +/- 0.02mm, and the surface roughness can reach N6 standard after milling.
Available Materials for machined parts: Aluminum,copper/ brass,stainless steel,stainless iron,carbon steel, Mild steel,cold roll steel, Plastic Bar,etc.
Finish treating: Anodizing,hard anodizing,electroplating of chrome/zinc/nickel plated, tinning,copperize,Colour spray-painting, blackening, hot-dip galvanizing, tephlon plating, etc.
Lead time for custom samples of metal machined parts is 10days.
Lead time for mass production:generally a order is 30-60days, if machining process is too complicated or quantity is very high,the lead time will longer.
We can provide COC (material certificate), Test Report, ROHS / SGS, plating report or coating reports also available !